Mulching of vegetation along Adelaide to Darwin railway corridor at various locations between Berrimah terminal (Northern Territory) to Tarcoola terminal (South Australia)
Client: FreightLink (BJB Joint Venture)
Location: Darwin to Tarcoola (South Australia)
Scope of work:
Level Crossings: Remove all vegetation North and South of level crossings back to 500m or 1000m as per instructions.
Remove all vegetation from edge of ballast / formation back to construction line (tree line)
Along Track: Clear all vegetation 5-10 metres out from formation shoulder
Remove all vegetation along formation at various locations between Ref: 2750 km (Darwin N.T) and Ref: 0504 km (Tarcoola, S.A) including the use of chainsaws and brush-cutters.
Clear corridor of vegetation through terminal yards. from Yard Limit Board to Yard Limit Board